===== Separation of concerns ===== | ===== Separation of concerns ===== | ||
- | The manufacturer owns manufacturing. | + | The designer takes responsibility for their design, and the manufacturer owns manufacturing. This means the manufacturer takes responsibility for managing the documents they need for manufacturing. |
- | The designer takes responsibility for their design, and the manufacturer takes responsibility for manufacturing. This means the manufacturer needs to take responsibility for managing the documents needed for manufacturing. | + | Don't expect the design engineer to hang onto production |
- | + | ||
- | Don't expect the design engineer to hang onto files that are no longer relevant from a design perspective | + | |
===== Fixed versus live data ===== | ===== Fixed versus live data ===== | ||
Line 19: | Line 17: | ||
Owning manufacturing also means being able to distinguish between a design version' | Owning manufacturing also means being able to distinguish between a design version' | ||
- | If you think the only thing that needs to change in a design is live data (e.g., the BOM) and it requires a design engineer' | + | If you think the only thing that needs to change in a design is live data (e.g., the BOM) and it requires a design engineer' |
===== Two succinct don'ts ===== | ===== Two succinct don'ts ===== | ||
+ | |||
+ | The above can be distilled down to two succinct don' | ||
Don't assume that the consulting design engineer will maintain a history of manufacturing files for you. If maintaining a history of manufacturing files is something you expect your consultant to do, expect to have to pay for the service. Reliable, traceable archiving isn't free, easy, or fun. It's work, and not the sort the design engineer wants to do. | Don't assume that the consulting design engineer will maintain a history of manufacturing files for you. If maintaining a history of manufacturing files is something you expect your consultant to do, expect to have to pay for the service. Reliable, traceable archiving isn't free, easy, or fun. It's work, and not the sort the design engineer wants to do. | ||
- | Don't ask the design engineer to just regenerate the production documents they sent you before because you either lost them documents | + | Don't ask the design engineer to just regenerate the production documents they sent you before because you either lost them or don't want to dig them up. Regenerating files that have been previously vetted requires vetting them all over again. In most cases this means a full round of testing and prototype building. A good designer will //not// release to manufacturing anything that has not been properly vetted. It's their ass on the line if something somehow |